Grey epoxy warehouse floor with yellow safety lines and pallet racking

Garage Floor Epoxy in Palm Beach Gardens, FL | Epoxy Boss

Get a Free Floor Assessment

Choose the service you're interested in, leave your name and phone number, and add a photo of your floor if you like. We'll get back to you within one business day.

Which service are you interested in?

Max file size 10MB.
Uploading...
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Palm Beach Gardens
Yes. Epoxy Boss Florida installs epoxy, flake and polyaspartic floor coatings in Palm Beach Gardens (ZIP codes 33410, 33412, 33418), Palm Beach County, for garages, patios and commercial floors. Most residential garages are finished in one to two days. Start with a free floor assessment: we check the slab, test moisture and recommend a system in writing.
59.2 sq mi
33410, 33412, 33418
Military Trl, Federal Hwy, Bee Line Hwy, Old Dixie Hwy
26.8488,-80.1671
M6556 2755l2 142 220 5 137-7 4 156-9 144 144-2 10-312 145 4 10-266 373 278 63 2-1 36 106 79 32 28 4 3 0-6 142 106 3-91-3 0 5-143 69 2 1 5 4 0-1 19 2 0-2 64 22 1 5 16 50 2 0-34 33 1 1-71 37 1 0 21 27 2-40 112 0 10 9 0 0-9 1 0 46-130 0-5 2 0 0 12 5 0 0 9 23 0 3-95-15-1 6-6 10-4 2-62 27 1 1-18 10 0 1-18 17 0 1-18 11 1 1-30 9 0 3-63-39-1 1-36 18 1 0 11 21 1 0-11 16 0 0-6-5 0-1-10 6 0 0-3 9 1 0-11 4 0 1-2 3 0 1 4 18 0 2 38 17 0 0-19 19 1 0 9 10 1 1-20-6 0 2-6 4 1 3-10 14 1 15 3 1-5-16-5 11-35 3 1 1-22-4 0 0-4 4 0 0-18-1-3-8 0-25 80-4 0 0 2-8 0 0-3-2 0-4 0 0 2-2 0 0-2-4-1 1-2-6-1 0-1-19 0-1-16-16 0 0-7-3 0 0-4-30-1 1-46-13-1 0 9-8 0 0-9-201-5 1-27 9 0 0-7 0-2-9 0 1-27 15 0 0 6 8 1 0 6 2 1 0-4 7 0 0-9 34 1 5 5 1 10 13 9 18 5 44 1 0 17 36 0 1-14 12 1 5 3 20 1 1-26-19-1 2-17 17 0 2-37-73-2 2-38 36 1 3-91 37 2 0-29 14 0-7-24-28 0-22-5-27-1-149-4-299-2 6 10-3 124-18 0-1 44-274-5 4-104 145 7 1-63 2-3 4-143-147-5-149-1-145-9-147-1-145 3 0 73-3 74-66-1-16 147-1 31 336 249-6 9-131-2-27 26-26-26-82-1-144 7 4-153 8 0 5-144-195-145-7 0-7 143-22 146-10 159-5 140zM8390 2595l2 0 0 2-2 0 0-2zM7910 2907l2-55 9 0 1-18 8 0-2 73-18 0zM8063 2902l0-12 3-11 1-5-3-3 3-7 1-23 22 2-3 54-20-1 0 6-4 0zM8175 2622l1-38 37 2-1 37-37-1zM7937 2907l1-18 9 0 1-23 18 0 0-12 53 1 0 18-8 0-1 35-73-1zM8097 2881l2-50 32 1 0 9 18 0-2 37 19 0-1 35-36-1 0-8-30-2-2-21zM8324 2626l7 0 1-9-8 0 0 9z

Palm Beach Gardens

Golf communities west, the PGA Boulevard corridor through the middle, newer building toward Donald Ross Road.
Classic car garage floor in Palm Beach Gardens, Florida

Garage & Commercial Floor Coatings in Palm Beach Gardens

Palm Beach Gardens was planned rather than grown, and it shows in the layout: golf and country club communities across the western half, the PGA Boulevard corridor through the middle, and newer construction toward Donald Ross Road.

Most residential work here goes through a design review, so samples go to the board before anything is booked. Younger slabs still get full grinding — fresh concrete is closed at the surface and will not bond until it is opened up. Closer to the Intracoastal the finish changes for salt.

Floor coatings built for Palm Beach Gardens

Palm Beach Gardens was planned rather than grown, and that shapes nearly every garage floor we coat here.

Golf and country club communities in the west. Most residential work goes through a design review, so we bring physical flake samples for the board and schedule the install after approval, so the floor is never laid twice.

The PGA Boulevard corridor. Offices, retail and service businesses need a seamless floor chosen around traffic and cleaning, installed on a schedule that keeps the business open.

Newer building toward Donald Ross Road. Young slabs are usually sound, but fresh concrete is closed at the surface and still needs full diamond grinding before any coating will bond. Closer to the Intracoastal the finish changes for salt.

Every garage gets a moisture check, crack repair and a UV-stable polyaspartic topcoat that stands up to Florida heat and hot tires. Most residential garages are finished in one to two days.

Garage floors

Full-broadcast flake over a resinous base under a clear polyaspartic topcoat. Flake system · polyaspartic garage flooring.

Commercial floors

Showrooms, offices and service bays along the PGA corridor. Commercial epoxy flooring.

Patios, pool decks and driveways

Patio coatings, pool deck coatings and driveway coatings built for full sun.

Failed or peeling coatings

Floor coating removal down to sound concrete before recoating.

Pick Your Side of the city

West Gardens North Gardens Central Gardens East Gardens

FAQ

I have several buildings on the property. Can you do them together?

Yes, and on larger lots it is usually the case. What we avoid is quoting them as one number, because those slabs were poured years apart and are rarely in the same condition.

Each one is assessed separately, then we sequence them in whatever order suits you.

My garage is newer. Does it still need full preparation?

Yes. A newer slab is usually in better condition, but the surface of fresh concrete is closed and a coating will not bond into it as it is.

Grinding opens the surface so the system anchors into the slab rather than sitting on top of it.

My community has to approve the color. Is that a problem?

No, it comes up constantly and we plan for it. With the garage door open the floor counts as something the neighbors see, so the board usually wants to sign off on the color first.

We bring physical samples you can submit and schedule the install once you have approval, so the floor is never done twice.

My building has to approve the work first. Can you help with that?

Yes, and on most buildings it is expected. Management normally wants written approval and proof of insurance naming the association before anyone starts.

We provide the documents and phase the work so residents keep access while it is under way.

My garage is close to the water. Is that a problem?

Not a problem, but it does change what we put down. Salt in the air is hard on a coating, and the first place it shows is around the edges and the door line rather than in the middle of the floor.

Close to the water we use a topcoat made for that exposure and seal the edges properly instead of running the coating to the wall and calling it done.

Can the work be done outside opening hours?

Yes, and where a space is in use during the day it is usually the sensible way to do it.

We phase the work into evenings and weekends and agree the sequence before starting, so you know exactly which areas are out of use and when.

My floor is old and stained. Can it still be coated?

Usually yes. Stains and old patches sit at the surface, and grinding takes that layer off before anything is applied.

What we check for underneath is moisture and structural cracking, since those decide the build rather than the appearance.

Will hot tires lift the floor?

Not with a properly bonded system. Hot-tire pickup happens when a coating is thin, poorly bonded or rolled on over unprepared concrete.

We grind rather than acid-etch, so the coating anchors into the slab instead of resting on top of it.

Will the floor fade or turn yellow in the sun?

Not with the right finish. A plain epoxy left exposed to daylight ambers and dulls, sometimes within a season, and in Florida most garage doors stay open a good part of the day.

We finish with a UV-stable topcoat, which is what keeps the color where it started.

There is already a coating down and it is peeling. What happens to it?

It comes off. A new system is only as sound as whatever it sits on, and putting fresh material over a failing one simply repeats the failure a year later.

We grind the old coating away mechanically, then assess the concrete underneath on its own condition.

Do you fix cracks and chipped edges first?

Yes. Cracks, chipped edges and failed patches are repaired as part of the preparation, not treated as an extra afterwards.

A coating does not bridge a moving crack on its own, so the repair has to happen first if the finish is going to stay flat.

How long before I can park on it?

You can walk on it the next day. Vehicles need longer, because tires put far more stress on a fresh coating than feet do.

We give you the exact window before we start, so you can plan where the car goes in the meantime.

Do I need to empty the garage first?

Yes, the floor has to be completely clear before we start — including shelving and anything fixed along the walls.

If moving heavy items is a problem, tell us when we quote and we will build it into the plan rather than leaving it to the morning of the job.

How soon can you get to Palm Beach Gardens?

Our shop is in Dania Beach and Palm Beach Gardens sits at the northern end of our area — a regular run, just a longer one.

Most estimates happen within a few days of your call.

Our services

Concrete Coating

Protective flooring systems engineered to strengthen, seal and preserve concrete surfaces exposed to traffic, chemicals, moisture and operational wear.
Learn More
Concrete coating system installed by Epoxy Boss Florida

Concrete Repair & Restoration

Protective flooring systems engineered to strengthen, seal and preserve concrete surfaces exposed to traffic, chemicals, moisture and operational wear.
Learn More
Concrete repair and restoration by Epoxy Boss Florida

Polished & Decorative Concrete

Protective flooring systems engineered to strengthen, seal and preserve concrete surfaces exposed to traffic, chemicals, moisture and operational wear.
Learn More
Polished concrete floor by Epoxy Boss Florida

Surface Preparation & Grinding

Protective flooring systems engineered to strengthen, seal and preserve concrete surfaces exposed to traffic, chemicals, moisture and operational wear.
Learn More
Concrete surface preparation in Miami, Florida

Waterproofing & Traffic Systems

Protective flooring systems engineered to strengthen, seal and preserve concrete surfaces exposed to traffic, chemicals, moisture and operational wear.
Learn More
Concrete waterproofing system by Epoxy Boss Florida

Nearby areas we serve

Related projects and guides

Recent Palm Beach County projects

Before you book

Ready to Upgrade Your Floors?

Custom epoxy systems tailored for garages, pool decks, showrooms, patios, and industrial environments — combining industrial-grade durability with premium aesthetics.

How we work

Epoxy Boss Florida crew preparing a concrete floor for coating
01

first touch with us

High-performance floor systems built for real-world abuse. From decorative epoxy toindustrial-grade traffic coatings, we install seamless finishes that resist impact, chemicals, and daily wear - without compromising on style. Includes overlays, traffic coatings, and advanced membrane systems for long-term protection.
02

Quotation

Get a clear and accurate price using our online calculator for instant estimates, or connect with us directly for a detailed quote. For more complex projects, we can schedule an on-site visit to finalize all details.
03

‍Decision making

We help you choose the right system, finish, and colors based on your goals. From flake to solid or metallic systems, you will have full clarity and confidence in your selection.
04

Scheduling + 50% Deposit

Once everything is confirmed, we lock in your project date. A 50% deposit secures your spot, allowing us to allocate materials and crew accordingly.
05

Day of the project

Our team completes full surface preparation including grinding and crack repair, followed by precise application of your selected multi-layered system based on manufacturer specifications.
06

Project Review

We walk through the finished space with you to ensure satisfaction. After approval, the remaining 50% balance is collected and the project is officially completed.