Light flake floor in an open garage facing a hedge

Epoxy Flooring Kendall, FL | Garage Floor Coatings

Get a Free Floor Assessment

Choose the service you're interested in, leave your name and phone number, and add a photo of your floor if you like. We'll get back to you within one business day.

Which service are you interested in?

Max file size 10MB.
Uploading...
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Kendall
Yes. We install epoxy, flake and polyaspartic floor coatings in Kendall (ZIP 33176), Miami-Dade County, for garages, patios and commercial floors. Most residential garages are finished in one to two days. Start with a free floor assessment: we check the slab, test moisture and recommend a system in writing.
16.1 sq mi
33176
Pinecrest Pkwy, Kendall Dr, Dixie Hwy, Killian Pkwy
25.6673,-80.3528

Kendall

Planned suburban communities stretching west, most of them built from the seventies onward.
Commercial flake floor in Kendall, Florida

Garage Floor Coatings in Kendall

Kendall is suburban on a large scale — planned communities laid out from the seventies onward and still spreading west. Garages are the bulk of the work here, two cars as standard, used for storage as much as for parking.

Slab age varies with how far west you go, so we check before quoting rather than assuming. Many of these communities manage appearance, which means samples go to the board before anything is scheduled.

Garage floors for Kendall's planned communities

Kendall is suburban on a large scale: planned communities laid out from the seventies onward and still spreading west. Garages are the bulk of the work here, two cars as standard, used for storage as much as for parking.

Slab age varies. Concrete gets younger the further west you go, so we check moisture and condition before quoting rather than assuming. Older slabs get a moisture-mitigating primer when the readings call for it.

Design rules. Many communities manage appearance, so physical samples go to the board before anything is scheduled.

Built for storage and parking. Diamond grinding, crack repair, full flake broadcast and a UV-stable polyaspartic topcoat that resists hot tires, oil and chemicals.

Garage floors

Full-broadcast flake under a clear polyaspartic topcoat. Most residential garages are finished in one to two days. Flake system · polyaspartic garage flooring.

Commercial floors

Commercial epoxy flooring for shops and service businesses.

Patios, pool decks and driveways

Patio coatings, pool deck coatings and driveway coatings.

FAQ

My garage is newer. Does it still need full preparation?

Yes. A newer slab is usually in better condition, but the surface of fresh concrete is closed and a coating will not bond into it as it is.

Grinding opens the surface so the system anchors into the slab rather than sitting on top of it.

My community has to approve the color. Is that a problem?

No, it comes up constantly and we plan for it. With the garage door open the floor counts as something the neighbors see, so the board usually wants to sign off on the color first.

We bring physical samples you can submit and schedule the install once you have approval, so the floor is never done twice.

Can the work be done outside opening hours?

Yes, and where a space is in use during the day it is usually the sensible way to do it.

We phase the work into evenings and weekends and agree the sequence before starting, so you know exactly which areas are out of use and when.

My floor is old and stained. Can it still be coated?

Usually yes. Stains and old patches sit at the surface, and grinding takes that layer off before anything is applied.

What we check for underneath is moisture and structural cracking, since those decide the build rather than the appearance.

Will hot tires lift the floor?

Not with a properly bonded system. Hot-tire pickup happens when a coating is thin, poorly bonded or rolled on over unprepared concrete.

We grind rather than acid-etch, so the coating anchors into the slab instead of resting on top of it.

Will the floor fade or turn yellow in the sun?

Not with the right finish. A plain epoxy left exposed to daylight ambers and dulls, sometimes within a season, and in Florida most garage doors stay open a good part of the day.

We finish with a UV-stable topcoat, which is what keeps the color where it started.

There is already a coating down and it is peeling. What happens to it?

It comes off. A new system is only as sound as whatever it sits on, and putting fresh material over a failing one simply repeats the failure a year later.

We grind the old coating away mechanically, then assess the concrete underneath on its own condition.

Do you fix cracks and chipped edges first?

Yes. Cracks, chipped edges and failed patches are repaired as part of the preparation, not treated as an extra afterwards.

A coating does not bridge a moving crack on its own, so the repair has to happen first if the finish is going to stay flat.

How long before I can park on it?

You can walk on it the next day. Vehicles need longer, because tires put far more stress on a fresh coating than feet do.

We give you the exact window before we start, so you can plan where the car goes in the meantime.

Do I need to empty the garage first?

Yes, the floor has to be completely clear before we start — including shelving and anything fixed along the walls.

If moving heavy items is a problem, tell us when we quote and we will build it into the plan rather than leaving it to the morning of the job.

How soon can you get to Kendall?

We are based in Dania Beach. Kendall is at the southern end of our range, but it is a run we make regularly.

Most estimates happen within a few days of your call.

Our services

Concrete Coating

Protective flooring systems engineered to strengthen, seal and preserve concrete surfaces exposed to traffic, chemicals, moisture and operational wear.
Learn More
Concrete coating system installed by Epoxy Boss Florida

Concrete Repair & Restoration

Protective flooring systems engineered to strengthen, seal and preserve concrete surfaces exposed to traffic, chemicals, moisture and operational wear.
Learn More
Concrete repair and restoration by Epoxy Boss Florida

Polished & Decorative Concrete

Protective flooring systems engineered to strengthen, seal and preserve concrete surfaces exposed to traffic, chemicals, moisture and operational wear.
Learn More
Polished concrete floor by Epoxy Boss Florida

Surface Preparation & Grinding

Protective flooring systems engineered to strengthen, seal and preserve concrete surfaces exposed to traffic, chemicals, moisture and operational wear.
Learn More
Concrete surface preparation in Miami, Florida

Waterproofing & Traffic Systems

Protective flooring systems engineered to strengthen, seal and preserve concrete surfaces exposed to traffic, chemicals, moisture and operational wear.
Learn More
Concrete waterproofing system by Epoxy Boss Florida

Nearby areas we serve

Kendall is part of our Miami-Dade County service area.

Nearby cities: South Miami, Palmetto Bay, Cutler Bay, Coral Gables and Doral.

Related projects and guides

Before you book

Ready to Upgrade Your Floors?

Custom epoxy systems tailored for garages, pool decks, showrooms, patios, and industrial environments — combining industrial-grade durability with premium aesthetics.

How we work

Epoxy Boss Florida crew preparing a concrete floor for coating
01

first touch with us

High-performance floor systems built for real-world abuse. From decorative epoxy toindustrial-grade traffic coatings, we install seamless finishes that resist impact, chemicals, and daily wear - without compromising on style. Includes overlays, traffic coatings, and advanced membrane systems for long-term protection.
02

Quotation

Get a clear and accurate price using our online calculator for instant estimates, or connect with us directly for a detailed quote. For more complex projects, we can schedule an on-site visit to finalize all details.
03

‍Decision making

We help you choose the right system, finish, and colors based on your goals. From flake to solid or metallic systems, you will have full clarity and confidence in your selection.
04

Scheduling + 50% Deposit

Once everything is confirmed, we lock in your project date. A 50% deposit secures your spot, allowing us to allocate materials and crew accordingly.
05

Day of the project

Our team completes full surface preparation including grinding and crack repair, followed by precise application of your selected multi-layered system based on manufacturer specifications.
06

Project Review

We walk through the finished space with you to ensure satisfaction. After approval, the remaining 50% balance is collected and the project is officially completed.