Grey epoxy floor in an auto repair shop with vehicle lifts

Epoxy Flooring Hollywood, FL | Garage Floor Coatings

Get a Free Floor Assessment

Choose the service you're interested in, leave your name and phone number, and add a photo of your floor if you like. We'll get back to you within one business day.

Which service are you interested in?

Max file size 10MB.
Uploading...
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Hollywood
Yes. We install epoxy, flake and polyaspartic floor coatings in Hollywood (ZIP codes 33019, 33020, 33021, 33022), Broward County, for garages, patios and commercial floors. Most residential garages are finished in one to two days. Start with a free floor assessment: we check the slab, test moisture and recommend a system in writing.
27.3 sq mi
33019, 33020, 33021, 33022
Hollywood Blvd, Federal Hwy, Sheridan St, Pines Blvd
26.0310,-80.1646

Hollywood

From the beach and the Lakes district out to the western neighborhoods — older slabs and shared buildings.
Brewery floor coating in Hollywood, Florida

Garage & Commercial Floor Coatings in Hollywood

Hollywood runs from the beach to the western edge of the county, and the concrete changes as you go. The Lakes and Hollywood Hills are largely mid-century, poured slab-on-grade onto fill; the buildings along the beach work under salt every day of the year.

So we read the address before choosing the material. Older slabs get a moisture check before anything decorative goes down. Shared buildings need board approval and a schedule that keeps residents parked, and we handle both. We are next door in Dania Beach, which usually means an estimate within the week.

Floor coatings built for Hollywood slabs

Hollywood runs from the beach to the western edge of the county, and the concrete changes as you go.

The Lakes and Hollywood Hills are largely mid-century, poured slab-on-grade onto fill. Those slabs get a moisture check before anything decorative goes down, and a moisture-mitigating primer when the readings call for it.

Beach-side buildings work under salt every day. Shared buildings need board approval and a schedule that keeps residents parked, and we handle both, with finishes made for salt and sealed terminations.

Western neighborhoods are newer, with sound concrete that still needs full mechanical preparation to bond. We are next door in Dania Beach, which usually means an estimate within the week.

Garage floors

Full-broadcast flake over a resinous base under a UV-stable polyaspartic topcoat. Most residential garages are finished in one to two days. Flake system · polyaspartic garage flooring.

Commercial floors

Shops, breweries, showrooms and service bays. Commercial epoxy flooring.

Patios, pool decks and driveways

Patio coatings, pool deck coatings and driveway coatings.

Failed or peeling coatings

Floor coating removal down to sound concrete before recoating.

FAQ

My house is older. Can you still coat the garage?

Usually yes. Age by itself is not the problem — moisture coming up through the slab is, and a lot of older houses here were built without a barrier underneath.

We check the slab before quoting. If the reading is high we put a barrier down first; if it is clean, nothing extra is needed.

My building has to approve the work first. Can you help with that?

Yes, and on most buildings it is expected. Management normally wants written approval and proof of insurance naming the association before anyone starts.

We provide the documents and phase the work so residents keep access while it is under way.

My garage is close to the water. Is that a problem?

Not a problem, but it does change what we put down. Salt in the air is hard on a coating, and the first place it shows is around the edges and the door line rather than in the middle of the floor.

Close to the water we use a topcoat made for that exposure and seal the edges properly instead of running the coating to the wall and calling it done.

Can the work be done outside opening hours?

Yes, and where a space is in use during the day it is usually the sensible way to do it.

We phase the work into evenings and weekends and agree the sequence before starting, so you know exactly which areas are out of use and when.

My floor is old and stained. Can it still be coated?

Usually yes. Stains and old patches sit at the surface, and grinding takes that layer off before anything is applied.

What we check for underneath is moisture and structural cracking, since those decide the build rather than the appearance.

Will hot tires lift the floor?

Not with a properly bonded system. Hot-tire pickup happens when a coating is thin, poorly bonded or rolled on over unprepared concrete.

We grind rather than acid-etch, so the coating anchors into the slab instead of resting on top of it.

Will the floor fade or turn yellow in the sun?

Not with the right finish. A plain epoxy left exposed to daylight ambers and dulls, sometimes within a season, and in Florida most garage doors stay open a good part of the day.

We finish with a UV-stable topcoat, which is what keeps the color where it started.

There is already a coating down and it is peeling. What happens to it?

It comes off. A new system is only as sound as whatever it sits on, and putting fresh material over a failing one simply repeats the failure a year later.

We grind the old coating away mechanically, then assess the concrete underneath on its own condition.

Do you fix cracks and chipped edges first?

Yes. Cracks, chipped edges and failed patches are repaired as part of the preparation, not treated as an extra afterwards.

A coating does not bridge a moving crack on its own, so the repair has to happen first if the finish is going to stay flat.

How long before I can park on it?

You can walk on it the next day. Vehicles need longer, because tires put far more stress on a fresh coating than feet do.

We give you the exact window before we start, so you can plan where the car goes in the meantime.

Do I need to empty the garage first?

Yes, the floor has to be completely clear before we start — including shelving and anything fixed along the walls.

If moving heavy items is a problem, tell us when we quote and we will build it into the plan rather than leaving it to the morning of the job.

How soon can you get to Hollywood?

We are based in Dania Beach, right next door, so Hollywood is a short run for us.

Most estimates happen within a few days of your call, and installation is usually scheduled soon after.

Our services

Concrete Coating

Protective flooring systems engineered to strengthen, seal and preserve concrete surfaces exposed to traffic, chemicals, moisture and operational wear.
Learn More
Concrete coating system installed by Epoxy Boss Florida

Concrete Repair & Restoration

Protective flooring systems engineered to strengthen, seal and preserve concrete surfaces exposed to traffic, chemicals, moisture and operational wear.
Learn More
Concrete repair and restoration by Epoxy Boss Florida

Polished & Decorative Concrete

Protective flooring systems engineered to strengthen, seal and preserve concrete surfaces exposed to traffic, chemicals, moisture and operational wear.
Learn More
Polished concrete floor by Epoxy Boss Florida

Surface Preparation & Grinding

Protective flooring systems engineered to strengthen, seal and preserve concrete surfaces exposed to traffic, chemicals, moisture and operational wear.
Learn More
Concrete surface preparation in Miami, Florida

Waterproofing & Traffic Systems

Protective flooring systems engineered to strengthen, seal and preserve concrete surfaces exposed to traffic, chemicals, moisture and operational wear.
Learn More
Concrete waterproofing system by Epoxy Boss Florida

Nearby areas we serve

Hollywood is part of our Broward County service area.

Nearby cities: Dania Beach, Hallandale Beach, Pembroke Pines, Miramar, Davie and Fort Lauderdale.

Related projects and guides

Projects near Hollywood

Before you book

Ready to Upgrade Your Floors?

Custom epoxy systems tailored for garages, pool decks, showrooms, patios, and industrial environments — combining industrial-grade durability with premium aesthetics.

How we work

Epoxy Boss Florida crew preparing a concrete floor for coating
01

first touch with us

High-performance floor systems built for real-world abuse. From decorative epoxy toindustrial-grade traffic coatings, we install seamless finishes that resist impact, chemicals, and daily wear - without compromising on style. Includes overlays, traffic coatings, and advanced membrane systems for long-term protection.
02

Quotation

Get a clear and accurate price using our online calculator for instant estimates, or connect with us directly for a detailed quote. For more complex projects, we can schedule an on-site visit to finalize all details.
03

‍Decision making

We help you choose the right system, finish, and colors based on your goals. From flake to solid or metallic systems, you will have full clarity and confidence in your selection.
04

Scheduling + 50% Deposit

Once everything is confirmed, we lock in your project date. A 50% deposit secures your spot, allowing us to allocate materials and crew accordingly.
05

Day of the project

Our team completes full surface preparation including grinding and crack repair, followed by precise application of your selected multi-layered system based on manufacturer specifications.
06

Project Review

We walk through the finished space with you to ensure satisfaction. After approval, the remaining 50% balance is collected and the project is officially completed.