Seamless
Safe
Code Complient
Designed For South Florida
Customizable

Gallery

No items found.

FAQ

My garage is newer. Does it still need full preparation?

Yes. A newer slab is usually in better condition, but the surface of fresh concrete is closed and a coating will not bond into it as it is.

Grinding opens the surface so the system anchors into the slab rather than sitting on top of it.

My house is older. Can you still coat the garage?

Usually yes. Age by itself is not the problem — moisture coming up through the slab is, and a lot of older houses here were built without a barrier underneath.

We check the slab before quoting. If the reading is high we put a barrier down first; if it is clean, nothing extra is needed.

My community has to approve the color. Is that a problem?

No, it comes up constantly and we plan for it. With the garage door open the floor counts as something the neighbors see, so the board usually wants to sign off on the color first.

We bring physical samples you can submit and schedule the install once you have approval, so the floor is never done twice.

My garage is close to the water. Is that a problem?

Not a problem, but it does change what we put down. Salt in the air is hard on a coating, and the first place it shows is around the edges and the door line rather than in the middle of the floor.

Close to the water we use a topcoat made for that exposure and seal the edges properly instead of running the coating to the wall and calling it done.

How long before I can park on it?

You can walk on it the next day. Vehicles need longer, because tires put far more stress on a fresh coating than feet do.

We give you the exact window before we start, so you can plan where the car goes in the meantime.

Do I need to empty the garage first?

Yes, the floor has to be completely clear before we start — including shelving and anything fixed along the walls.

If moving heavy items is a problem, tell us when we quote and we will build it into the plan rather than leaving it to the morning of the job.

My garage floor bubbled and peeled within a year. What happened?

Almost always one of two things. Either the slab was never tested for moisture and vapor lifted the coating from below, or the preparation was acid etching rather than mechanical grinding, so the coating never had a proper mechanical bond.

Both are preparation failures, not product failures — which is why replacing the coating without addressing the cause produces the same result again.

Do flake floors fade in Florida sunlight?

A UV-stable topcoat is used to protect the decorative layer against sun exposure, helping maintain color consistency over time.

Ready to Upgrade Your Floors?

Custom epoxy systems tailored for garages, basements, showrooms, patios, and industrial environments — combining industrial-grade durability with premium aesthetics.

How we work

01

first touch with us

High-performance floor systems built for real-world abuse. From decorative epoxy toindustrial-grade traffic coatings, we install seamless finishes that resist impact, chemicals, and daily wear - without compromising on style. Includes overlays, traffic coatings, and advanced membrane systems for long-term protection.
02

Quotation

Get a clear and accurate price using our online calculator for instant estimates, or connect with us directly for a detailed quote. For more complex projects, we can schedule an on-site visit to finalize all details.
03

Decision making

We help you choose the right system, finish, and colors based on your goals. From flake to solid or metallic systems, you will have full clarity and confidence in your selection.
04

Scheduling + 50% Deposit

Once everything is confirmed, we lock in your project date. A 50% deposit secures your spot, allowing us to allocate materials and crew accordingly.
05

Day of the project

Our team completes full surface preparation including grinding and crack repair, followed by precise application of your selected multi-layered system based on manufacturer specifications.
06

Project Review

We walk through the finished space with you to ensure satisfaction. After approval, the remaining 50% balance is collected and the project is officially completed.